Skip to content

Mapping & Design Data

Survey Control

Are all our crews and datasets working from the same reference?

Also called: control survey, geodetic survey, gnss / gps control, benchmarks, or ground control points.

Understanding the work

Control surveys set and measure reference points using GNSS, total station, and differential leveling. They give a project a single, verified coordinate and elevation framework, including ground control for aerial and drone mapping.

  • Large construction projects
  • Drone & aerial mapping
  • GIS & municipal mapping

Who it’s for

  • Large and phased developments
  • Aerial mapping and drone providers
  • Teams combining several surveys

Typical work involved

  • Control planning and monument setting
  • GNSS, traverse, and leveling observations
  • Network adjustment and datum checks

The result

What you’ll receive

  • Control point network
  • Coordinate & elevation report
  • Ties to NAD 83 / NAVD 88

Common questions

What clients ask about this work

What coordinate system will my drawing use?

The project should specify its datum, units and coordinate system. If you need Florida State Plane or another grid, tell us before work begins.

Can you establish project control for multiple crews?

Control surveys can create a common coordinate and elevation reference. The scope should define datum, accuracy and how others will use it.

What is a benchmark?

A benchmark is a reference point with an established elevation. Survey crews use suitable benchmarks and control to relate project measurements.

Browse all questions

Scope, applicable standards, accuracy, deliverables, timing, and price are confirmed in writing for each project.